On September 30, Tata Steel ceased its main steel production activities at Talbot Port in Wales, UK, following the closure of the last blast furnace.
In fact, Tata Steel UK has already closed its No. 5 blast furnace and Morfa coke oven in the area in early July this year. The closure of blast furnace 4 marks the end of Tata Steel UK, the UK's largest steelmaker, from its main steel production activities at Port Talbot, leaving only a small hot and cold strip mill that rolls imported billets.
At the same time, the company plans to invest 1.25 billion pounds (about $1.64 billion) to build an electric furnace plant, and the British government will provide 500 million pounds (about $650 million) of financial support. The company plans to resume production by 2027-2028 to ensure a greener future. At the same time, the company announced that it will maintain more than 5,000 jobs while cutting 2,800 positions during the transition.
Tata Steel UK said that without the change, all of its steelmaking operations would come to an end. That's because the company is currently losing £1 million (about $1.3 million) almost every day.
My company hot sale steel pipe and pipe fittings:
ASTM A106 B seamless pipes,(1” to 24” sch40, sch80),
API 5L GR.B steel pipes, (seamless pipe, LSAW pipe, SSAW pipes, 1” to 110” sch 40, sch80),
Boiler tubes,( 20G. 12Cr1MoVG, ASTM A335 P5, P9, P11),
ASTM A333 GR.6 seamless pipes, ( 1” to 24” sch40, sch80, sch160),
TP304/304L, TP316/TP316L, stainless steel pipes, (1” to 48” sch10, sch20, sch40, sch80),
API 5L X65, X70 PSL2 LSAW welded pipes, (20” to 60” sch40, sch80, sch160),
API 5CT seamless casing, and tubing, (2 3/8” to 20” K55, J55, N80, L80, P110),
Pipe fittings, elbow, reducer, ,tee,cap, flange
Contact: Mr. Lee
Phone: 13931739696
Tel: 0317-5500163
Email: sale@galaxy-steel.com
Add: 1202, Floor 12, Culture and Art Building, Yunhe District, Cangzhou, Hebei